We built the outdoor lighting from scratch: cable routes, lighting column foundations and connections all the way to the house distribution board. The client chose and ordered the light fittings and prepared the initial sketch.
The lighting cable was run in 450 N protective conduit, which withstands the load of the ground and allows the cable to be replaced later without digging again. For the lighting columns we drilled the holes and cast concrete foundations.
Work began with the plan to cut the trenches with a trencher, which cuts a narrow slot into the ground and disturbs the landscaping as little as possible. Part of the route turned out to be too stony for that and an excavator had to be brought in.