Power cable run to a driveway gate

A power cable run from the house distribution board to the driveway gate, with the paving lifted and relaid.

Project

Driveway gate cabling

For a private house we ran the driveway gate's power cable from the house distribution board to the gate. We lifted the paving stones, laid the cable, compacted the ground, then relaid and compacted the paving. The price did not include the design change introduced by the company that produced the electrical design for the house.

Work carried out

  • lifting the paving stones
  • cable run from the house distribution board
  • compacting the ground
  • relaying and compacting the paving stones
Project details
Project Power cable run to a driveway gate
Location Tartu
Client private client
Cost approximately 1000€ excluding VAT
Planning something similar? Request a quote

Photos from the site

All our work Next: Lighting for the Tartu city coat of arms

Let's talk about your project

Briefly describe what needs doing and we will reply within 24 hours.

Request a quote +372 5349 3240